| Port of Los Angeles Channel Deepening |
|
|
From October 2002 through December 2004, Nilex installed 2,300,000 l.f. of prefabricated vertical wick drains offshore, through as much as 40' of water, to depths up to 120 ft., as well as 8,800,000 l.f. of wick drains installed on land, to depths of 98 ft. Nilex had as many as 5 installation machines on site, and installed as much as 220,000 l.f. in a 24 hour period.
|