|
Piezometers
measure the pressure of the water in the compressible layers. By monitoring this pressure and tracking the
dissipation, the project engineers can determine that the settlement is
complete, and surcharge removal or additional construction can commence. When used in conjunction with settlement
monitoring plates, a redundant system of site monitoring ensures completion of
the settlement waiting period.
Nilex can install pneumatic
piezometers concurrently with the wick drain installation to facilitate monitoring without the expense or failure rate of the vibrating wire type or the expense and coordination of subcontracting
to another company.
|
 | | A piezometer attached to a wick drain anchor plate, before installation. |
 | | The piezometer is loaded into the mandrel for installation. |
|
|