Piezometers E-mail

Piezometers measure the pressure of the water in the compressible layers.  By monitoring this pressure and tracking the dissipation, the project engineers can determine that the settlement is complete, and surcharge removal or additional construction can commence.  When used in conjunction with settlement monitoring plates, a redundant system of site monitoring ensures completion of the settlement waiting period.

Nilex can install pneumatic piezometers concurrently with the wick drain installation to facilitate monitoring without the expense or failure rate of the vibrating wire type or the expense and coordination of subcontracting to another company.

A piezometer attached to a wick drain anchor plate, before installation.
A piezometer attached to a wick drain anchor plate, before installation.

 

The piezometer is loaded into the mandrel for installation.
The piezometer is loaded into the mandrel for installation.

 
< Prev
Technologies
Wick Drains
Earthquake Drains
Tank Liners
Geomembranes
Emerging Technologies
Latest Site Updates
Most Popular Pages
Most Popular Downloads

For more information, please contact your nearest Nilex Construction Office.

Denver Headquarters
15171 E. Fremont Drive
Centennial, CO 80112
U.S.A.
Phone: (303) 766-2000
Fax: (303) 766-1110
denver@nilex.com
Pittsburgh, Pennsylvania 5035 Jefferson Ave.
Avella, PA 15312
U.S.A.
Phone: (724) 587-0880 Fax: (724) 587-0870 jwarren@nilex.com
San Francisco, California 91 Greenville Road
Livermore, CA 94550
U.S.A.
Phone: 925-449-6001
jfoster@nilex.com
Calgary, Alberta
1521 Hastings Cr. S.E.
Calgary, AB, Canada
T2G 4C8
Phone: (403) 543-5454
Fax: (403) 543-5455
calgary@nilex.com
Edmonton, Alberta
9304 - 39 Avenue N.W.
Edmonton, AB, Canada
T6E 5T9
Phone: (780) 463-9535
Fax: (780) 463-1773
edmonton@nilex.com

Printed from http://www.nilexconstruction.com